Power / Electrical

From Pyropedia
Jump to: navigation, search
Power / Electrical
Area: Site-Ops
Current Lead: cLovis
Contact:

Description

Area: Site-Ops

The Power/Electrical Lead is responsible for ensuring safe and reliable power for infrastructure. Infrastructure groups requiring power/electrical needs are the Effigy, PETS, Rangers, Fire Safety, Sanctuary, Ice, Greeters, Safety Lighting, Radio Communications, Parking, the Grove.

Responsibilities and Tasks

  • Rent and hook up 20K generator for the Effigy and DaFT.
  • Rent and hook up 3K and 5K generators for Ice, Rangers, Safety Lighting, and Sanctuary.
    • All generators rented are whisper quiets where possible for aesthetic reasons at the event.
  • Hook up LLC-owned generators for Parking and Greeters.
  • Arrange transportation to and from the event of the generators, whether by the power lead or through the community truck, etc..
  • Makes sure the appropriate fuel and oil are available during the event for the generators.
    • The various leads receiving the generators are responsible for ensuring fueling and maintaining the oil levels in the generators occurs during the event(basically requires the knowledge to maintain a lawnmower).
  • Maintains the existing onsite power at the event:
    • Two (2) fused outlets on the upper field
    • power by the showers
    • above the cave
    • down at the water's edge.
  • Helps ensure plenty of extension cords are available for the various infrastructure requirements.
    • While not strictly the power lead's responsibility, sufficient cordage should be maintained for the ensural of a safe operation.
  • Act as a resource on electrical information to all the infrastructure leads on basic requirements and safety, including city planning when possible.

Other Entities/Leads with Whom the Lead Likely Will Collaborate

Volunteer to Help the Power / Electrical

This department does not have a volunteer wiki page. You can find out more information about volunteering in this department by contacting the Site-Ops AF.

Current Power / Electrical

cLovis

Previous Leads

  • 2018 Alexandra
  • 2017 Alexandra
  • 2016 Alexandra
  • 2015 Alexandra
  • 2014 Sodium
  • 2013 Anderson
  • 2012 Anderson
  • 2011 Princess
  • 2010 Princess
  • 2009 Clovis
  • 2008 Clovis
  • 2007 Clovis
  • 2006 Clovis